Configuration Options
- Tubular and finned tubular elements
- Flanged or slide-in construction inquiries
- Terminal and zone layout by drawing
Tubular & Immersion
Provide the duct cross-section and airflow range so the heating element layout can be evaluated. Include temperature rise requirements and how the assembly will mount.

Configuration
The final construction depends on your drawing and operating conditions.
Provide the heat duty and airflow range with the duct drawing. The minimum airflow is used to review element cooling and temperature limits.
| Design input | What to provide |
|---|---|
| Airflow and temperature rise | Minimum, normal and maximum airflows, inlet temperature range and required outlet temperature. State the conditions used for volumetric flow. |
| Opening and mounting | Clear duct width and height or diameter, flow direction, flange or slide-in details and terminal access. Show elbows or obstructions near the heater. |
| Pressure drop | Give the allowable pressure drop and available fan data. Include filters or dampers that can reduce the flow across the element. |
| Power and controls | Confirm voltage, phase and stages. Include the required airflow proving, over-temperature protection and temperature sensor positions. |
Typical projects include process ventilation, drying equipment and industrial air ducts.
Include your technical requirements, target quantity and any supporting drawings.