Tubular & Immersion

Over-the-Side Immersion Heaters

An over-the-side immersion heater enters an open tank from above and mounts at the rim or on a support. It can suit tanks with top access. The layout must keep the active section submerged at the minimum operating liquid level and leave enough clearance to remove the assembly.

Illustration of a top-entry immersion heater with a mounting bracket and bent immersion section
Illustrative configuration

Configuration

Specify Your Requirements

The final construction depends on your drawing and operating conditions.

Configuration Options

  • Rim or support mounting by tank drawing
  • Vertical drop and formed active section by tank geometry
  • Sheath and cold-zone length selected for the medium and liquid level
  • Lead or terminal enclosure placement above the intended liquid level

Include in Your RFQ

  • Tank dimensions, rim profile and mounting details
  • Minimum and maximum liquid levels, including operating changes
  • Liquid chemistry, working temperatures and warm-up time
  • Heated depth, removal clearance, voltage, phase and target power

Measure From the Tank Rim to the Heated Section

Show the mounting reference and the liquid levels on the same drawing. The unheated drop passes through the surface and the active section stays below the minimum operating level.

Measure From the Tank Rim to the Heated Section
ReferenceWhat to mark
Rim or independent supportSupport height and profile, mounting holes, clamp clearance and available lifting space.
Minimum liquid levelLowest operating level, including drawdown and other normal level changes. Mark the clearance above the entire heated span.
Heated section and bottom clearanceStart and end of the active zone, tank bottom, baskets, racks and any parts the heater must clear during use and removal.
Side view of a rim-mounted arrangement. The single line shows the unheated drop, and the double line shows the heated section below the lowest liquid level.

Typical Applications

Typical projects involve open process tanks with overhead access for installation and service. Include the positions of racks, baskets, vessel walls, tank covers and other obstructions in the drawing.

Ordering Questions

When does an over-the-side heater suit a process tank?
Consider this mounting when the vessel can be accessed from above and the rim or an independent support can carry the assembly. Confirm the path for insertion and removal. A flanged or screw plug design uses a compatible tank connection instead.
How do I specify immersion depth and the cold zone?
Show the mounting reference, minimum liquid level, tank bottom and the boundaries of the heated section on the drawing. These dimensions define where the unheated section passes through the liquid surface and where the active section remains submerged.
What must be checked before choosing the sheath and power?
Provide the liquid composition, volume, operating temperature range and warm-up target. Include agitation or flow, possible deposits, minimum level and the available electrical supply so the element surface loading and materials can be evaluated.

Selection Guides

Request this configuration

Include your technical requirements, target quantity and any supporting drawings.

Request a Quote