Configuration Options
- Threaded plug connection
- Single or multiple elements
- Lead and terminal enclosure choices
Tubular & Immersion
Share the thread standard and available insertion envelope when scoping a screw plug immersion heater. Application details guide material and element selection.

Configuration
The final construction depends on your drawing and operating conditions.
Use the port drawing to identify the thread and sealing interface before measuring the heater envelope. Include both the vessel-side clearance and the space for wiring outside the tank.
| Fit check | What to confirm |
|---|---|
| Thread and seal | Confirm the exact standard, such as NPT, BSPT or BSPP, where applicable. Mark the sealing method and installed reference face on the mating-port drawing. |
| Inside clearance | Show the length to the nearest wall or internal obstruction, the bundle diameter and orientation, and the minimum operating liquid level. |
| Terminal enclosure | Give the available envelope, cable-entry direction, ambient temperature and exposure to water, dust or cleaning. State the required enclosure rating if specified by the equipment design. |
Typical projects include water and oil heating through a threaded tank port.
Include your technical requirements, target quantity and any supporting drawings.