Configuration Options
- Container opening or supported rim mounting reviewed by drawing
- Tube profile, sheath and wetted materials by liquid and geometry
- Active length, load and terminal enclosure by installed conditions
Tubular & Immersion
A drum immersion heater transfers heat directly from the submerged active sheath to the liquid. Send the drum or pail drawing, the liquid specification and the planned mounting and withdrawal path. The available opening, insertion depth and minimum fill level determine which tube layouts can be reviewed.

Configuration
The final construction depends on your drawing and operating conditions.
Provide a section through the container and its opening. Mark the mounting reference, available standing height and active section at the lowest operating liquid level.
| Fit check | What to supply |
|---|---|
| Opening or rim installation | Give the opening inside diameter and any thread or adapter drawing. For a supported rim, provide the rim profile, support position and lifting access. |
| Insertion and submergence | Show the maximum tube envelope that will pass through the opening, inserted depth, bottom clearance and lowest operating liquid level. Mark the terminal position. |
| Liquid and heat load | Provide liquid composition, working volume, viscosity or deposits if relevant, heat-up time and required temperature. Include available power and any level or temperature protection interfaces. |
Typical inquiries include direct heating of compatible liquids in drums, pails and buckets with a defined mounting interface and liquid level.
Include your technical requirements, target quantity and any supporting drawings.